Planning, delivery, assembly and commissioning of a new steam boiler system
- Steam boiler system 3,200 kg/h with integrated exhaust gas heat exchanger
- Condensation heat exchanger
- Vapour heat exchanger
- Heat recovery from low-temperature compressors, deep freeze compressors, decompression condensate and warm water from various units
- Groundwater tank
- Water service module for new and existing old boiler
- New flue with supporting tube, prepared for a second flue
- 3 control cabinets
- New steam distributor
- Combination burner (Gas, HEL)
General contracting, application planning, engineering, delivery, electrical and mechanical assembly, measurement and control technology, training the operation staff, commissioning