Refurbishment and optimisation of the steam boiler system
- Installation of a flue gas condensation heat exchanger
- Osmosis system for boiler feed-water
- Refurbishment of the feed-water module including complete degassing, installation of an exhaust vapour heat exchanger
- Equipping the existing boiler with new measuring technology, new burners and electrical equipment
- Installation of a load-dependent boiler sequencing control system
- Initial and detailed planning
- Delivery and installation (mechanical, electrical) of the components
- Submission of documents to the authorities, TÜV
- Automation, visualisation
- Start-up
- Documentation
All refurbishments were conducted without ceasing operations.
Energy conservation:
- Reduction of waste gas temperature and fuel consumption
- Increase in efficiency