Installing a new casein system and lactose system
- Engineering for all of the adaptations to the system
- Process engineering planning
- Reconfiguring the system to fully automatic operation
- Planning relocation
- Disassembling the existing systems
- Transportation including special transportation
- Electrical and mechanical assembly
- Commissioning including trial operation
- Documentation