Planning, delivery, assembly and commissioning of a new steam boiler system for meat industry
- 3,200 kg/hour steam boiler system with integrated exhaust gas heat exchanger
- Flue gas condensation heat exchanger
- Vapour heat exchanger
- Gas burner
- Water service module consisting of a feed-water tank, a nozzle degassing device and a sample cooler
- Water preparation consisting of a reverse osmosis plant and softening
- Boiler control cabinet
- Chimney
General contracting, initial and detailed planning, submission planning, delivery, mechanical and electrical installation, Measurement and control equipment, commissioning, training the operation staff, documentation