Heat recovery - Kärntnermilch reg.Gen.m.b.H.

Heat recovery

  • exact determination of needs for optimal design to operational requirements
  • integration of a new 6,000 kg/h steam boiler into the existing steam system
  • exhaust gas heat exchanger for heating the feed water
  • condensation exhaust gas heat exchanger for heating the process water
  • modern dual-fuel burner (oil, natural gas)

Result of the energy-efficiency measures

  • reduction in operating costs
  • improvement in overall effectiveness
  • reduced fuel requirement
  • reduction in the exhaust gas temperature through exhaust gas heat exchanger
  • condensation exhaust gas heat exchanger for heating the process water
  • reliability through dual-fuel burners

Our Services

  • General contracting
  • Submission of documents to the authorities
  • Engineering
  • Delivery
  • Mechanical and electrical installation
  • Measurement and control technology
  • Training the operation staff
  • Commissioning

The energy efficiency measures were awarded the klimaaktiv Prize on 5 December 2016. The proven saving amounts to 2,361,695 per year.

All referencesOur customersBoiler SystemsEnergy optimisation