Planning, delivery and installation of a new steam boiler system – Standort Graz
Project: Modernisation and optimisation of the steam system for process heating.
- 8,000 kg/h steam boiler plant
- natural gas burner with FU fan and O2 control
- integrated flue gas condensation heat exchanger,
- condensation heat exchanger (WT-EDTM-4B)
- exhaust vapour heat exchanger
- feed-water module including complete degassing
- osmosis system
-
chimney
Concept, submission of documents to the authorities, engineering, delivery, mechanical and electrical installation, measurement and control technology, training of operational staff, commissioning
Every year 3.921.800 kWh of energy is saved, the degree of efficiency of the steam boiler plant is 102.7%.
klimakativ awarded the project for its "significant contribution to reduce CO2-emissions".